What We Do

Services

Everything we cover, from a single pothole to a full lot repave.

Home › Services

Everything we take on

Every job below is one we do ourselves across New York.

Asphalt Driveway Paving

We excavate and compact the subgrade, lay a stone base, then pave in a binder course and a surface course so the driveway can handle a car in freezing weather and heat. Most residential driveways run two to three inches of asphalt over a compacted base, more if the soil underneath is soft clay.

Asphalt Parking Lot Paving

Commercial lots take more base and more asphalt than a driveway because trucks and daily traffic load them harder. We grade for drainage toward the catch basins first, because a lot that ponds water fails early no matter how thick the asphalt is.

Asphalt Sealcoating

Sealcoat is a maintenance coat, not a repair, it keeps water, oil and UV out of the asphalt between repavings. We recommend it every two to three years on a driveway, and we won't sealcoat over cracks that should be filled first.

Asphalt Crack Repair

Cracks under a half inch get a hot pour rubberized sealant that flexes with the asphalt through freeze-thaw. Wider cracks or alligator patterns mean the base has moved, and sealant alone won't fix that, we'll tell you if that's the case before quoting it as a simple crack job.

Pothole Repair

A pothole is usually water that got under the surface and then froze and expanded. We cut the damaged asphalt back to solid material, square the edges, and compact new base before patching, instead of dumping cold patch in the hole and calling it done.

Asphalt Resurfacing & Overlays

If the base underneath is still solid, we can mill off the top layer or pave a new surface course right over the old one. It costs less than a full tear-out and works well on driveways and lots where the cracking is surface-level, not structural.

Asphalt Milling

Milling grinds off the top layer of old asphalt before a repave, so the new surface ties in flush at the edges and doesn't build up height at the garage door or a storefront entrance.

Parking Lot Striping

Faded lines make a lot look worn even when the asphalt underneath is fine. We lay out parking stalls, fire lanes and ADA markings to spec after a repave or as a standalone job.

Asphalt Patch Repair

For smaller areas of failed asphalt, a sunken spot or a utility cut, we cut it out and patch it to match the grade around it so water doesn't collect in a dip.

Asphalt Curb & Apron Installation

We pour asphalt curbing and driveway aprons, including the city-regulated apron section where a driveway meets the street. That strip has its own permit requirements in New York, and we handle the application as part of the job.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across New York, NY

These are the towns where we actually show up to pave and patch.

New York, NY
Newark, NY
Jersey City, NY
Yonkers, NY
Paterson, NY
Elizabeth, NY
Stamford, NY
Edison, NY
New Rochelle, NY
Union City, NY
Mount Vernon, NY
White Plains, NY
Common Questions

Things worth asking

What usually comes up once a paving job is underway.

Do I need a permit for a new driveway apron?
In New York, the section of driveway where it meets the public street, the apron, typically requires a permit from the Department of Transportation before work starts. An asphalt contractor familiar with local requirements can file that paperwork as part of the job.
How long does asphalt paving take?
A standard residential driveway usually takes one to two days, with one day for base prep and excavation and a separate day for paving once the base is compacted. Larger parking lots take longer depending on square footage and how much of the base requires rebuilding.
How long before I can drive on new asphalt?
New asphalt requires at least two to three days to cure enough for regular car traffic, and longer in cooler weather since lower temperatures slow the cooling and hardening process. Parking in the same spot repeatedly during the first week should be avoided, since the surface is still setting and can take an impression.
Can you work within a tight budget?
Asphalt resurfacing or an overlay over a sound existing base costs considerably less than a full tear-out and repave, and is worth discussing if the base underneath isn't actually failing. A contractor should be upfront about where corners can be cut safely and where they can't, like base compaction, which shouldn't be skipped to save money.
Do you offer any guarantee on the work?
Most asphalt contractors back their paving and patch work against workmanship defects for a set period, though that typically doesn't cover damage from heavy equipment, tree roots or soil movement unrelated to the paving itself. Getting the specific coverage in writing before the job starts avoids confusion later.
Who do I deal with during the job?
On most residential and small commercial asphalt jobs, the homeowner deals directly with the crew lead or the contractor running the job, not a rotating call center. That makes it easier to flag something, like where a drain should sit, before it's paved over.
What type of asphalt do you use?
Standard hot mix asphalt is used for most driveways and lots, laid in a binder course and a surface course for proper strength, while cold mix is only suitable for temporary pothole patching in cold weather. The ratio of stone, sand and asphalt binder in the mix affects durability, and a contractor should be able to explain what mix design is being used.
Can I still use my driveway or parking lot during the work?
The area being paved must stay clear of vehicle traffic during excavation, base compaction and paving, and for several days afterward while the asphalt cures. Arranging alternate parking before the job starts avoids delays on paving day.
What if you find a drainage problem once you start digging?
If excavation uncovers a drainage issue, like water pooling against the base from a downspout or poor grading, that has to get addressed before paving, or the new asphalt will fail in the same spot. A contractor should flag it and explain the added cost before proceeding, not bury the asphalt over a known problem.
How do I take care of new asphalt after it's installed?
Sealcoating every two to three years protects new asphalt from water, oil and UV damage, and cracks should get filled as soon as they appear rather than left to widen. Avoiding parked heavy vehicles like RVs in the same spot for extended periods prevents rutting from concentrated weight.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (718) 673-2559